logo
english
english
français
Deutsch
Italiano
Русский
Español
português
Nederlandse
ελληνικά
日本語
한국
العربية
हिन्दी
bahasa indonesia
Home > products > Plastic Pipe Extrusion Line >
20mm - 110mm Water Supply Drainage Pipe Tube Production Line

20mm - 110mm Water Supply Drainage Pipe Tube Production Line

110mm Drainage Pipe Production Line

20mm Water Supply Pipe Production Line

Place of Origin:

China

Brand Name:

SHENZHEN HYPET

Certification:

CE, ISO9001

Model Number:

HYPVC-110

Contact Us
Request A Quote
Product Details
Key Word:
20mm - 110mm PVC Pipe Production Line
Voltage:
380V 50HZ 3Phase(Customized)
Condition:
New
Plastic Processed:
PVC
Application:
Pipe
After-sales Service Provided:
Engineers Available To Service Machinery Overseas,Field Installation,commissioning And Training,Video Technical Support,Online Support
Warranty:
15 Months
Highlight:

110mm Drainage Pipe Production Line

,

20mm Water Supply Pipe Production Line

Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
USD28000/set - USD40000/set
Packaging Details
Standard Export Packaging
Delivery Time
40-60 work days
Payment Terms
L/C, T/T
Supply Ability
10 sets per month
Product Description

20mm - 110mm Water Supply Drainage Pipe Tube Production Line
 
Whole production line composition:
Auto loader - Extruder - Die head - Vacuum tank - Printer - Haul off unit - Cutter - Stacker
 
Machine features:
a. It can be equipped with a mixer, a belling machine, etc., fully automatic production, saving production costs
b. 51/105 extruder can be used with output 200kg/h or 55/120 with output 280kg/h can be selected
c. Can be used as water supply pipe, drain pipe, high calcium pipe, etc.
c. Siemens PLC controls the entire production line, HYPET software, and high configuration
k. The vacuum box is natural color, paint-free, high-quality, and high-precision control.
 
Configuration list
Note: This table as attached file, which is for selection of the configuration on the whole line

SNItemsChoosing configurationRemark
1Production control systemPLC control systemDigital control system
2Cooling system of the main control electric cabinetFan cooling electric cabinet 
3Main motorAC motor with famous inverter 
4Pressure sensorHYPET individual temperature and pressure control in two parts 
5Core thermoregulation controlInternal closed loop heat balancing system. 
6Material of screw & barrel typeNitro Alloy with bi-metal in two parts 
7Quantitative feeding system’s mixing functionTwin screw with mixing device option 
8Pipe calibrator sleeveCopper calibrator sleeve 
9CutterDustless type in new technology 

 
Condition of use
1. Technical features of whole line

SNSpecificationDescriptionRemark
1Suitable materialPVC powder 
2Pipe diameter rangeØ20-Ø110mm 
3Production speed1.5 ~ 15 m/min 
4Max. output140kg/h 
5Test and acceptBased on HYPET standard formula. 
6Center height1,000mm 
7Whole line size (L x W x H)21,000 x 1,200 x 2,450mm 

 
2. Circumstances condition

SNConditionSpecificationDescription
1

Natural
circumstance
condition

Working placeIndoor use
Power sourceNo dangerous area
Humidity55%~85% no condensation
Temperature0~40 ℃
2

Electricity
source

Installation capacity100 kW
Actual power consumption30 kW
Power supply3P+N+PE
Voltage/Frequency380V/50Hz, others can be optional
3Cooling waterTemperature≤15 ℃
Water pressure≥0.3MPa
Flow~15 m3/h
4Air conditionCompressor air pressure≥0.6MPa
Flow~0.9 m3/min

 
20mm - 110mm Water Supply Drainage Pipe Tube Production Line 0
 
Terms & conditions
1. Training and services
1) Instruction of field installation
2) Equipment field debugging and trial run if required by the buyer according to the rule.
3) Training on field operation and maintenance for customer's personnel.
4) Provide technical consultation service on long-term basis.
 
2. Installation and debugging
When the machine arrives at site, the customer should install it on the appropriate position according to the specifications provided by the supplier; and then the supplier should send its engineers to the site if requirement approved,in order to instruct the customer about trial run and debugging. The customer should provide necessary conditions for trial run and provide materials for trial run, and should decide the processing conditions in trial run with consideration of the supplier's opinions.
1) The price covers the pre-commissioning of the machinery before shipment at Seller's site. The Seller is obliged to test the performance of machinery.
2) The Buyer is obliged to provide suitable space, tools and manpower for the commissioning of the order.
3) This Price does not included commission and installation in buyer’s factory.
 
3. Pricing
1) The above mentioned quotation is valid within 30 days counted from the issue date of quotation.
2) The price and machinery configuration should be updated and confirmed by the Seller in the case that the quotation has been beyond the validity period.
3) The above mentioned quotation is based on Ex works. Sea transportation and wooden case packing is excluded.
4) The price does not cover the cost of testing material. The testing material will be supplied by the Buyer. Or the Seller will purchase the material as requested by the Buyer at Buyer's cost.
5) The price does not include the cost of commissioning at Buyer's site.

The Seller reserves the right to modify the specification and design of the machine in order to enhance the product quality.
 
4. Terms of payment
1) T/T and L/C (irrevocable, at sight) both are acceptable.
2) 30% of the total contract value should be paid in advance, balance 70% of the total value is to be paid before shipping at the Seller’s factory.
 
5. Time of delivery
1) When the contract becomes valid, the machine should be delivered within 50 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.
2) During production, provided that the Buyer requests to modify the specification of the order, the Buyer shall notify the Seller of this modification in written form. Upon receipt of the notice, the Seller will quote to the Buyer the cost of this modification and notify the Buyer of any possible delay due to this modification.

 
6. Debugging charge
The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (80USD/day).

Send your inquiry directly to us

Privacy Policy China Good Quality Plastic Extruder Machine Supplier. Copyright © 2021-2025 Shenzhen HYPET Co., Ltd. . All Rights Reserved.